Required Inspections

| Plumbing Inspection: | Building Inspections: |
| 1. Rough-in 2. Sewer/Water Service Lines 3. Top Out/Gas Piping Rough 4. Final Plumbing & Gas |
1. Foundation 2. Framing 3. Final |
| Electrical Inspections: | HVAC Inspections: |
| 1. Temporary Electrical Pole 2. Rough-in 3. Final |
1. Rough-in
2. Final
|
| Insulation Inspections: | Storm Water Inspections: |
| 1. Wall insulation 2. Final ceiling insulation |
Ongoing until Final Building Inspection |
City Hall 207 N. 12th St. Nederland, TX 77627
409-723-1503
